PROJECTS

Diving Inspection and UT thickness meter contract.

Contract Duration: 7 days

Client: Bridgeway Consultants 

We carried out a detailed inspections on the bridge structures and surrounding steel Piles. the detailed inspection surveys included a full dimensional, conditional and steel thickness survey using the latest Cygnes underwater thickness meters. the purpose of the survey was to assess the steel structures suitability for the installation of a new foot bridge located next to the main structure. 

The works were based on a fixed price basis and works were completes on budget and ahead of schedule. 

Diving Inspection and Refurbishment Contract.

Contract Duration: 2 Months 

Client: Cambridge County Council

We carried out detailed inspections on 22 bridge structures around Cambridge, Peterborough and Bedford. The detailed inspection surveys included a full dimensional, conditional and scour evaluation. 5 of the structures required remedial works and our services were procured to carry out repairs. These ranged from re-pointing, re-grouting, underpinning, block and brick replacement and score remediation around cut-waters.

All works were based on a fixed price basis and work were complete on budget and ahead of schedule. 

TT2 Element Installation services.

Contract Duration: 4 months 

Client:  Volker Stevin 

We were contracted by Volker Stevin to carry out the immersion phase of the 4 concrete elements structures that together made the new Tyne tunnel, Newcastle. The operations took place during the winter of 2009/2010. the Dive team conducted the operations 24/7 in snow,ice and temperatures of -12.

The project was completed on budget and ahead of schedule. 

Minley Quayside Reconstruction Services 

Contract Duration: 5 Days

Client: Babcock international. 

Babcock International asked us to reconstruct a collapsed section of quay used for diver training. The project involved stabilizing the existing quayside, underpinning and re-concreting the whole area. The team also re-graded the shingle surface and removed all debris from the work-site. 

The project was once again completed on budget and ahead of schedule. 

Diving Inspection and Fishpass Installation

Contract Duration: 7 Days

Client: Aquatic Control Engineering 

We were asked by Aquatic Control Engineering on behalf of the Environment Agency to install eel pass systems to structures located around Norfolk. This project was carried out during the winter to minimise disruption to the public 

Bow River Village - Phase 2

Contract Duration: 3 Weeks

Client: Higgins Group plc 

The Canal and River Trust required remedial work carrying out to the canal wall to include application of Sika 610 to steel piles, below water concrete repairs and the design/ fabrication and installation of re-cycled plastic fenders at in-pans.  

Ipswich Quay wall Rebuild 